Abstract
The objective of this two-year project was to develop probability methods for the steady-state reliability evaluation of the combined generation and transmission systems of an electric utility. The methods include advanced mathematical models for computing reliability indexes. A prototype computer program was develop0ed capable of computing reliability indexes for systems with up to 150 buses.
Original language | English (US) |
---|---|
Pages (from-to) | var paging |
Journal | Electric Power Research Institute, (Report) EPRI EL |
Volume | 1 |
State | Published - Jan 1 1982 |