Abstract
In recent years, construction enterprises’ poor economic performance and the drain of senior technical personnel have been two cause-and-effect problems, which seriously restrict the enterprises’ long-term development, and the existing researches contribute little to solve the problems for managers. Considering the uncertainties of talents resource demand resulting from the difference of Multi-project schedule, a cyclic queuing theory of fixed number of customers was introduced from the enterprise management level. Then the risk loss curve and waiting loss curve could be simulated according to historical data and management experience. Finally, a best method to allocate the shortage of technical talents came out. The model was built throughout the management processes, so it owned not only high theoretical basis but also high operability, and has a better reference on solving the two construction enterprises problems.
| Original language | English (US) |
|---|---|
| Title of host publication | Renewable Energy and Power Technology II |
| Editors | Mojie Sun |
| Publisher | Trans Tech Publications Ltd |
| Pages | 2225-2230 |
| Number of pages | 6 |
| ISBN (Electronic) | 9783038352860 |
| DOIs | |
| State | Published - 2014 |
| Event | 2nd International Conference on Renewable Energy and Environmental Technology, REET 2014 - Dalian, China Duration: Aug 19 2014 → Aug 20 2014 |
Publication series
| Name | Applied Mechanics and Materials |
|---|---|
| Volume | 672-674 |
| ISSN (Print) | 1660-9336 |
| ISSN (Electronic) | 1662-7482 |
Other
| Other | 2nd International Conference on Renewable Energy and Environmental Technology, REET 2014 |
|---|---|
| Country/Territory | China |
| City | Dalian |
| Period | 8/19/14 → 8/20/14 |
Bibliographical note
Publisher Copyright:© (2014) Trans Tech Publications, Switzerland.
Keywords
- Allocation methods
- Multi-project management
- Queuing theory
- The brain drain