Abstract
The hydroelectric facility owned by the City of Granite Falls, Minnesota, consisted of two Francis turbines supplying a total of 450 kW. The proposed addition of an 800 kW unit could only be justified if the cost was low, such as that of a fixed blade, fixed vane propeller turbine, and the new enlarged facility would be effective at peak loads. This, and other complications, resulted in an interesting and challenging operation scheme.
| Original language | English (US) |
|---|---|
| Title of host publication | Unknown Host Publication Title |
| Editors | Brian W. Clowes |
| Publisher | ASCE |
| Pages | 1123-1130 |
| Number of pages | 8 |
| ISBN (Print) | 087262630X |
| State | Published - 1988 |
Publication series
| Name | |
|---|---|
| Volume | 2 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Fingerprint
Dive into the research topics of 'PEAK LEAD SHAVING WITH A FIXED BLADE, FIXED VANE PROPELLER TURBINE.'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS