Abstract
This paper develops an analytical framework for ramp metering, under which various ramp control strategies can be viewed as ramifications of the same most-efficient control logic with different threshold values, control methods, and equity considerations. The most-efficient control logic only meters the entrance ramps nearest critical freeway mainline sections so as to eliminate freeway internal queues, which is derived from a new formulation of the optimal ramp control problem. Instead of assuming the availability of real-time origin-destination information, the new formulation takes advantages of the stability and predictability of off-ramp exit percentages. Those properties of the off-ramp exit percentages are supported by empirical data, and allow us to formulate the optimal ramp control problem as a linear program whose input variables are all directly measurable by detectors in real-time. The solution is also tested on a real-world freeway section in a microscopic traffic simulator for demonstration. Time-dependent origin-destination tables and off-ramp exit percentages are compared as two alternative ways to represent the true real-time demand patterns that are important to freeway ramp metering.
Original language | English (US) |
---|---|
Pages (from-to) | 869-887 |
Number of pages | 19 |
Journal | Transportation Research Part B: Methodological |
Volume | 38 |
Issue number | 10 |
DOIs | |
State | Published - Dec 2004 |
Bibliographical note
Funding Information:This research was part of the project Measuring the Equity and Efficiency of Ramp Meters funded by the Minnesota Department of Transportation. The authors would like to thank the Center for Transportation Studies at the University of Minnesota and International Road Federation for providing additional support. The authors want to thank James Aswegan, John Bieniek, John Hourdakis, Rich Lau, and Frank Lilja for their assistance. The opinions and errors remain those of the authors.
Keywords
- Freeway operations
- OD table
- Off-ramp exit percentage
- Ramp metering