Keyphrases
Ground Source Heat Pump
100%
Ground Heat Exchanger
100%
Steel pile
100%
Geothermal Heating
33%
Model Validation
33%
Economic Cost
33%
Steady State
33%
Double Tube
33%
Heat Exchanger
33%
Finite Element Analysis
33%
3D numerical Model
33%
Ground Temperature
33%
Building Cooling
33%
Transient Operation
33%
Outlet Temperature
33%
Heat Exchange
33%
Building Heating
33%
Field Installation
33%
Model Elements
33%
Pile Geometry
33%
Borehole Field
33%
Heat Exchange Rate
33%
Helical pile
33%
Geothermal Cooling
33%
Engineering
Heat Exchange
100%
Ground Heat Exchanger
100%
Ground Source Heat Pump
100%
Transients
50%
Ground Temperature
50%
Exchanger
50%
Flowrates
50%
Outlet Temperature
50%
Building Heating
50%
Model Element
50%
Numerical Model
50%
Borehole
50%
Finite Element Analysis
50%