Abstract
The implementation and integration of a mixture of material requirements planning (MRP) and just-in-time/total-quality-control (JIT/TQC) systems at the AT&T Denver works are discussed. This task was especially challenging because of the high complexity and high demand volatility of the product. Furthermore, MRP and JIT/TQC systems can be in conflict if applied incorrectly. The authors review the criteria used in selecting production control systems and discuss some of the analytical techniques used to implement these systems and their hybrids. They conclude with a synopsis on how the various and potentially conflicting systems were integrated to achieve the best of both approaches.
| Original language | English (US) |
|---|---|
| Title of host publication | Proc First Int Conf Syst Integr ICSI 90 |
| Publisher | Publ by IEEE |
| Pages | 415-425 |
| Number of pages | 11 |
| ISBN (Print) | 0818690275 |
| State | Published - Dec 1 1990 |
| Event | Proceedings of the First International Conference on Systems Integration - ICSI '90 - Morristown, NJ, USA Duration: Apr 23 1990 → Apr 26 1990 |
Publication series
| Name | Proc First Int Conf Syst Integr ICSI 90 |
|---|
Other
| Other | Proceedings of the First International Conference on Systems Integration - ICSI '90 |
|---|---|
| City | Morristown, NJ, USA |
| Period | 4/23/90 → 4/26/90 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Fingerprint
Dive into the research topics of 'Integrated pull manufacturing--The integration of MRP & JIT systems'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS