@inproceedings{705243626ad84aaf95ccf656bcb1c775,
title = "Hydroproject risk analysis",
abstract = "Traditionally, feasibility studies performed for potential hydropower sites have included either no uncertainty or at best an ad hoc value associated with estimated benefits. However, formal methods for analyzing uncertainty do exist and have been outlined in the past. An application of these methods is demonstrated through conversion of a hydropower survey program, HYFEAS, to run on LOTUS 1-2-3, using the add-in software package RISK. The program principals are outlined and a case study of it's application to a hydropower site is presented.",
author = "Murdock, {Robert U.} and Gulliver, {John S.}",
year = "1991",
month = jan,
day = "1",
language = "English (US)",
isbn = "0872628140",
series = "Waterpower '91: A New View of Hydro Resources",
publisher = "Publ by ASCE",
pages = "1--10",
editor = "Darling, {David D.}",
booktitle = "Waterpower '91",
note = "Proceedings of the International Conference on Hydropower ; Conference date: 24-07-1991 Through 26-07-1991",
}