Abstract
The Mainstream System excluding North Branch and the Calumet System excluding Indiana A venue tunnel of Greater Chicago were studied in 1988. The solutions based on these systems were suggested in a project report [1)1 in 1988. Since then a new North Branch tunnel is being planned to join the original Mainstream System, and the Indiana A venue tunnel to be added to the Calumet System, it therefore becomes necessary to reevaluate the previously suggested operational plans. A new computer simulation and solution alternatives for these expanded systems are described in this report. The 'North Branch System has also been studied separately and reported herein.
Original language | English (US) |
---|---|
State | Published - Aug 1992 |
Fingerprint
Dive into the research topics of 'Hydraulic Transient Modeling of TARP Systems'. Together they form a unique fingerprint.University Assets
-
St. Anthony Falls Laboratory
Lian Shen (Director)
St. Anthony Falls LaboratoryEquipment/facility: Facility