Abstract
The wide variability of conditions encountered in field testing of turbines is illustrated by examining two case studies with widely different scenarios. One site involved field acceptance testing of two four-Megawatt pit turbines installed in a new run-of-river plant. The second involved performance testing of 71 open flume Francis runners installed in the early 1900s.
| Original language | English (US) |
|---|---|
| Title of host publication | Proc Int Conf Hydropower |
| Publisher | Publ by ASCE |
| Pages | 1515-1524 |
| Number of pages | 10 |
| ISBN (Print) | 0872627233 |
| State | Published - 1989 |
| Event | Proceedings of the International Conference on Hydropower - Niagara Falls, NY, USA Duration: Aug 23 1989 → Aug 25 1989 |
Publication series
| Name | Proc Int Conf Hydropower |
|---|
Other
| Other | Proceedings of the International Conference on Hydropower |
|---|---|
| City | Niagara Falls, NY, USA |
| Period | 8/23/89 → 8/25/89 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Fingerprint
Dive into the research topics of 'Field efficiency testing of hydroelectric turbines'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS