Abstract
A special algorithm of the event start time of BESIII is presented. The principle and the code design are described, the segment finding and the linear fitting are used in this code by the MDC geometric information and hit information. At last event start time is calculated. The tuning and checking have been done carefully by the MC data samples, the results show that the code and the algorithm are reliable.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 491-496 |
| Number of pages | 6 |
| Journal | Hedianzixue Yu Tance Jishu/Nuclear Electronics and Detection Technology |
| Volume | 27 |
| Issue number | 3 |
| State | Published - May 2007 |
Keywords
- BESIII
- Event start time
- Linear fitting360°
- MDC
Fingerprint
Dive into the research topics of 'Event start time determination in BESIII by using MDC segment information'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS