Skip to main navigation
Skip to search
Skip to main content
Experts@Minnesota Home
Search content at Experts@Minnesota
Home
Profiles
Research units
University Assets
Projects and Grants
Research output
Datasets
Press/Media
Activities
Fellowships, Honors, and Prizes
Impacts
Data-driven battery-lifetime-aware scheduling for electric bus fleets
Songyuan Li
, Shibo He
, Shuai Wang
, Tian He
, Jiming Chen
Center for Transportation Studies
Research output
:
Contribution to journal
›
Article
›
peer-review
10
Link opens in a new tab
Scopus citations
Overview
Fingerprint
Fingerprint
Dive into the research topics of 'Data-driven battery-lifetime-aware scheduling for electric bus fleets'. Together they form a unique fingerprint.
Sort by
Weight
Alphabetically
Keyphrases
Battery Degradation
100%
Lifetime-aware
100%
Electric Bus Fleet
100%
Battery Life
100%
Electric Vehicle
66%
Degradation Rate
66%
Arrival Rate
66%
Passenger Service
66%
Electric Bus
66%
Electric Bus Scheduling
66%
Further Development
33%
Public Transportation
33%
Network Systems
33%
Prediction Model
33%
Scheduling System
33%
Operative Time
33%
Global Energy
33%
Performance Guarantee
33%
Global Warming
33%
Battery Pack
33%
Reliable Performance
33%
Limited Battery
33%
GPS Dataset
33%
Daily Operation
33%
Scheduling Strategy
33%
Manufacturing Cost
33%
Waiting Queue
33%
Bus Operation
33%
Passenger Behavior
33%
Lyapunov Optimization
33%
Bus Station
33%
Data Buffer
33%
Transaction Dataset
33%
Energy Scarcity
33%
Reliability Prediction
33%
Computer Science
Public Transportation
100%
Performance Guarantee
100%
Prediction Model
100%
Baseline Method
100%
Manufacturing Cost
100%
Lyapunov Optimization
100%
Data Buffer
100%
Experimental Result
100%
Scheduling Strategy
100%
Global Warming
100%
Global Positioning System
100%
Engineering
Electric Vehicle
100%
Arrival Rate
100%
Bus Fleet
100%
Degradation Rate
100%
Experimental Result
50%
Peak Hour
50%
Battery Pack
50%
Reliable Performance
50%
Global Energy
50%
Scheduling Strategy
50%
Network System
50%
Global Warming
50%
Manufacturing Cost
50%
Daily Operation
50%
Global Positioning System
50%