Abstract
This paper develops an approximate model for simultaneously determining reorder intervals and planned lead times for MRP systems. Unlike previous research, this model explicitly considers commonality, non-instantaneous production, multiple work centres (with multiple machines and with limited capacity), and queue inventory carrying cost. Four heuristic solution procedures for the non-linear integer optimization problem are proposed and compared with an exact branch-and-bound algorithm on a set of forty test problems. The results suggest that two of the heuristics are both effective and efficient.
| Original language | English (US) |
|---|---|
| Pages (from-to) | 605-620 |
| Number of pages | 16 |
| Journal | Journal of the Operational Research Society |
| Volume | 43 |
| Issue number | 6 |
| DOIs | |
| State | Published - Jun 1992 |
Keywords
- Heuristics
- Materials requirements planning
- Multi-echelon production-inventory systems
Fingerprint
Dive into the research topics of 'A model for determining tactical parameters for materials requirements planning systems'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS