Project Details
Description
Neural Refrigeration Cycle Network enabled Optimal Control of Closed-loop Fluid Infrastructure System
| Status | Finished |
|---|---|
| Effective start/end date | 2/17/25 → 2/16/26 |
Funding
- SAMSUNG ELECTRONICS
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.