Project Details
Description
This project will select study and control sites for the installation of dynamic curve warning signs at several locations in Minnesota. The PI will assist in the installation of the signs and speed data will be collected before the installation and for
Status | Finished |
---|---|
Effective start/end date | 5/20/09 → 9/30/12 |
Funding
- MN DEPARTMENT OF TRANSPORTATION
- US DOT FEDERAL HIGHWAY ADMINISTRATION
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.