Developing Optimum Drainage Design Guidelines for the Re

Project: Research project

Project Details

Description

Developing Optimum Drainage Design Guidelines for the Red River Basin
StatusFinished
Effective start/end date1/27/111/31/13

Funding

  • USDOD ARMY CORPS OF ENGINEERS

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.