Continuation of the Evaluation of Water Repellency Reduc

Project: Research project

Description

Continuation of the Evaluation of Water Repellency Reduction Methods and Groundwater Recharge Distribution at the Bemidji Oil Spill Site
StatusFinished
Effective start/end date6/20/1812/31/19

Funding

  • MN POLLUTION CONTROL AGENCY

Fingerprint

oil spill
recharge
groundwater
water
evaluation
method
distribution