Projects per year
Search results
-
Active
Sawing and Sealing Joints in Bituminous Pavements to Control Cracking
Marasteanu, M., Barman, M. & Le, J.
MN DEPARTMENT OF TRANSPORTATION
7/21/23 → 6/30/25
Project: Research project
-
Using electric vehicle onboard data for pavement quality assessment and management
Marasteanu, M., He, Q. & Stern, R.
MN DEPARTMENT OF TRANSPORTATION, US DOT FEDERAL HIGHWAY ADMINISTRATION
7/1/23 → 6/30/25
Project: Research project
-
Investigation on Mix Design of Recycled Asphalt Pavement (RAP) Materials
MN DEPARTMENT OF TRANSPORTATION
6/5/23 → 6/30/25
Project: Research project
-
Effect of Tree Shade on State Highway 34 Winter Maintenance Operations
MN DEPARTMENT OF TRANSPORTATION
3/20/23 → 4/30/24
Project: Research project
-
Haul Road and Detour Maintenance
MN DEPARTMENT OF TRANSPORTATION
12/6/22 → 8/31/24
Project: Research project
-
Mitigation of tenting of transverse cracks and joints in asphalt pavement
MN DEPARTMENT OF TRANSPORTATION
6/28/22 → 6/30/24
Project: Research project
-
Pavement Marking/Colored Pavement Friction Differential and Product Durability
Marasteanu, M. & Duhn, M. L.
MN DEPARTMENT OF TRANSPORTATION
6/4/21 → 2/28/24
Project: Research project
-
Finished
Cost Estimate of B vs. C Grade Asphalt Binders
MN DEPARTMENT OF TRANSPORTATION
6/4/21 → 6/30/23
Project: Research project
-
A qualitative and quantitative assessment of pavement segments that have remained in poor condition for 5+ years
MN DEPARTMENT OF TRANSPORTATION
7/24/19 → 6/30/21
Project: Research project
-
Remaining Service Life Asset Measure, Phase 2
Marasteanu, M., Davis, G. A. & Khani, A.
MN DEPARTMENT OF TRANSPORTATION
7/24/19 → 2/28/22
Project: Research project
-
Development of Superpave 5 asphalt mix designs for Minnesota pavements
MN DEPARTMENT OF TRANSPORTATION
6/20/19 → 6/30/22
Project: Research project
-
Innovative Materials and Advanced Technologies for a Sus
Le, J., Marasteanu, M. & Zanko, L. M.
MN DEPARTMENT OF TRANSPORTATION
6/22/18 → 6/30/21
Project: Research project
-
Remaining Service Life Asset Measure, Phase 1
Marasteanu, M. & Schultz, A. E.
MN DEPARTMENT OF TRANSPORTATION
6/20/17 → 6/30/18
Project: Research project
-
Experimental and Computational Investigations of High De
Marasteanu, M., Barman, M., Hill, K. M. & Le, J.
MN DEPARTMENT OF TRANSPORTATION
6/20/17 → 4/30/20
Project: Research project
-
Investigation of Cracking Resistance of Asphalt Mixtures
MN DEPARTMENT OF TRANSPORTATION
5/19/16 → 2/28/19
Project: Research project
-
A Mechanistic Design Approach for Novel Graphene Nanopla
MN DEPARTMENT OF TRANSPORTATION
5/14/15 → 2/28/18
Project: Research project
-
Pothole Prevention and Innovative Repair
MN DEPARTMENT OF TRANSPORTATION
4/20/15 → 3/31/18
Project: Research project
-
-
Full Depth Reclamation (FDR) for Suburban/ Urban and Loc
MN DEPARTMENT OF TRANSPORTATION
6/6/14 → 2/28/17
Project: Research project
-
Investigation of Optimal Mix Design of Full Depth Reclam
MN DEPARTMENT OF TRANSPORTATION
6/14/13 → 4/30/16
Project: Research project
-
Design and Performance of Asphalt Mixtures Containing Hi
MN DEPARTMENT OF TRANSPORTATION
2/8/11 → 3/31/12
Project: Research project
-
-
Air Voids Testing for MnROAD Cells
MN DEPARTMENT OF TRANSPORTATION
10/27/09 → 9/30/10
Project: Research project
-
-
Asphalt Mixture and Binder Fracture Testing for 2008 MnR
MN DEPARTMENT OF TRANSPORTATION
7/23/08 → 1/31/10
Project: Research project
-
Investigation of Low Temperature Cracking in Asphalt Pav
Marasteanu, M., Labuz, J. F. & Stolarski, H. K.
MN DEPARTMENT OF TRANSPORTATION
6/17/08 → 8/31/12
Project: Research project
-
Improved Mix Design, Evaluation, and Materials Managemen
AUBURN UNIVERSITY, National Center for Asphalt Technology
4/15/08 → 3/31/11
Project: Research project
-
Development of a Simple Test to Determine the Low Temper
NATIONAL ACADEMY OF SCIENCES, TRANSPORTATION RESEARCH BOARD
1/1/08 → 6/30/09
Project: Research project
-
Investigation of In-Place Asphalt Film Thickness and Per
MN DEPARTMENT OF TRANSPORTATION
10/16/06 → 6/30/09
Project: Research project
-
Determination of Optimum Time for the Application of Sur
MN DEPARTMENT OF TRANSPORTATION
5/1/05 → 7/31/08
Project: Research project
-
Calibration of the 2002 AASHTO Pavement Design Guide for
Khazanovich, L. & Marasteanu, M.
MN DEPARTMENT OF TRANSPORTATION
7/12/04 → 1/31/09
Project: Research project