Projects per year
Search results
-
Active
Use of Innovative Sustainable and Durable Materials in Concrete Pavements
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION, US DOT FEDERAL HIGHWAY ADMINISTRATION
12/16/24 → 2/15/28
Project: Research project
-
Best Practices for Joint Sawing
Barman, M. (PI)
IOWA STATE UNIVERSITY, IOWA DEPT OF TRANSPORTATION
12/1/23 → 11/30/25
Project: Research project
-
Sawing and Sealing Joints in Bituminous Pavements to Control Cracking
Marasteanu, M. (PI), Barman, M. (CoI) & Le, J. (CoI)
MN DEPARTMENT OF TRANSPORTATION
7/21/23 → 2/28/26
Project: Research project
-
Mitigation of tenting of transverse cracks and joints in asphalt pavement
Barman, M. (PI) & Marasteanu, M. (CoI)
MN DEPARTMENT OF TRANSPORTATION
6/28/22 → 6/30/25
Project: Research project
-
Taconite as a lower cost alternative High Friction Surface Treatment to Calcined Bauxite for low volume roads in Minnesota
Zanko, L. M. (PI), Barman, M. (CoI) & Marasteanu, M. (CoI)
MN DEPARTMENT OF TRANSPORTATION
7/1/20 → 6/30/25
Project: Research project
-
Finished
Towards the Development of Pavement-Specific Structural Synthetic Fibers
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION, US DEPARTMENT OF TRANSPORTATION
3/22/21 → 6/30/24
Project: Research project
-
Optimizing Asphalt Mixture Designs for Low-Volume Roads of Minnesota
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION
6/7/19 → 8/31/23
Project: Research project
-
Establishing Fresh Properties of Fiber Reinforced Concrete for Performance Engineered Mixture (PEM)
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION
6/7/19 → 6/30/22
Project: Research project
-
Performance Benefits of Fiber-reinforced Thin Concrete P
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION
11/1/17 → 6/30/21
Project: Research project
-
INFLUENCE OF FIBER DOSAGE ON THE RESIDUAL STRENGTH RATIO
Christiansen, M. U. (PI) & Barman, M. (CoI)
AMERICAN ENGINEERING TESTING INC
7/17/17 → 8/21/17
Project: Research project
-
Cost/Benefit Analysis of the Effectiveness of Crack Seal
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION
7/10/17 → 6/30/19
Project: Research project
-
Experimental and Computational Investigations of High De
Marasteanu, M. (PI), Barman, M. (CoI), Hill, K. M. (CoI) & Le, J. (CoI)
MN DEPARTMENT OF TRANSPORTATION
6/20/17 → 4/30/20
Project: Research project
-
Performance Comparisons of Structural Fibers and Develop
Barman, M. (PI)
MN DEPARTMENT OF TRANSPORTATION
6/1/16 → 8/31/18
Project: Research project
-
Disc-shaped Compact Tension Testing of Asphalt for St. L
Barman, M. (PI)
2/29/16 → 5/31/16
Project: Research project
-
Comprehensive Field Evaluation of Asphalt Patching Techn
Barman, M. (PI), Dailey, J. (Prior Principal Investigator) & Dave, E. V. (Prior Principal Investigator)
MN DEPARTMENT OF TRANSPORTATION
9/25/13 → 8/31/17
Project: Research project