Projects per year
Search results
-
Finished
Compost in Stormwater Bioretention Systems
Erickson, A. (PI) & Gulliver, J. S. (CoI)
COMPOST RESEARCH AND EDUCATION FOUNDATIO
9/22/22 → 11/30/23
Project: Research project
-
Updating the 2009 Stormwater BMP Maintenance Resource Guide
Erickson, A. (PI) & Gulliver, J. S. (CoI)
MN DEPARTMENT OF TRANSPORTATION
7/1/22 → 6/30/24
Project: Research project
-
Project Title: Stormwater Pond Maintenance, and Wetland Management for Phosphorus Retention
Gulliver, J. S. (PI)
MN DEPARTMENT OF TRANSPORTATION
7/15/20 → 6/30/23
Project: Research project
-
Climate Change Adaptation of Urban Stormwater Infrastructure
Gulliver, J. S. (PI)
MN DEPARTMENT OF TRANSPORTATION, US DOT FEDERAL HIGHWAY ADMINISTRATION
7/14/20 → 6/30/23
Project: Research project
-
Evaluation of Environmental Impacts of Potassium Acetate Used as a Road Salt Alternative
Gulliver, J. S. (PI) & Chun, C. L. (CoI)
MN DEPARTMENT OF TRANSPORTATION
8/7/19 → 7/31/22
Project: Research project
-
Wet Pond Maintenance for Phosphorus Retention
Gulliver, J. S. (PI) & Finlay, J. C. (CoI)
MN DEPARTMENT OF TRANSPORTATION
5/22/19 → 6/30/22
Project: Research project
-
Detailed Hydrology for Stormwater BMPs
Herb, W. R. (PI) & Gulliver, J. S. (CoI)
MN DEPARTMENT OF NATURAL RESOURCES, U.S. DEPARTMENT OF COMMERCE
9/25/18 → 2/28/20
Project: Research project
-
Investigation of Road Salt Alternatives and Pavement Innovations
Gulliver, J. S. (PI)
LEGISLATIVE-CITIZEN COMMISSION ON MN RES
7/1/18 → 6/30/22
Project: Research project
-
Design and Construction of Infiltration Facilities
Gulliver, J. S. (PI)
MN DEPARTMENT OF TRANSPORTATION
6/13/18 → 8/31/21
Project: Research project
-
Characterization of Runoff Quality from Paved Low Volume
Gulliver, J. S. (PI)
MN DEPARTMENT OF TRANSPORTATION
10/5/17 → 11/30/20
Project: Research project
-
Impacts of Adding Salt to Our Lakes, Rivers and Groundwa
Gulliver, J. S. (PI) & Heger, S. F. (CoI)
LEGISLATIVE-CITIZEN COMMISSION ON MN RES
7/1/16 → 6/30/19
Project: Research project
-
Iron-Enhanced Swale Ditch Checks for Phosphorus Removal
Gulliver, J. S. (PI)
MN DEPARTMENT OF TRANSPORTATION
6/16/16 → 6/30/19
Project: Research project
-
Permeable Pavement for Road Salt Reduction
Gulliver, J. S. (PI)
MN DEPARTMENT OF TRANSPORTATION
5/26/16 → 8/31/20
Project: Research project
-
Stormwater Research Priorities and Pond Maintenance
Peterson, J. M. (PI), Baker, L. A. (CoI), Bilotta, J. P. (CoI), Chapman, J. A. (CoI), Finlay, J. C. (CoI), Gulliver, J. S. (CoI), Hozalski, R. M. (CoI), Missaghi, S. (CoI) & Simcik, M. (CoI)
4/27/16 → 6/30/18
Project: Research project
-
Internal Phos. Load Redluction with Iron Filings
Gulliver, J. S. (PI) & Arnold, B. (CoI)
MN POLLUTION CONTROL AGENCY, U.S. ENVIRONMENTAL PROTECTION AGENCY
7/18/14 → 8/30/17
Project: Research project
-
Performance of an Agricultural Drainage Tile Filter
Gulliver, J. S. (PI)
MN POLLUTION CONTROL AGENCY, U.S. ENVIRONMENTAL PROTECTION AGENCY
7/1/14 → 6/30/17
Project: Research project
-
Enhancement and Application of MIDS Dry Swale Calculator
Gulliver, J. S. (PI) & Nieber, J. L. (CoI)
MN DEPARTMENT OF TRANSPORTATION
9/11/13 → 5/31/16
Project: Research project
-
Guidelines for Permeable Pavement Systems
Gulliver, J. S. (PI) & Khazanovich, L. (CoI)
MN DEPARTMENT OF TRANSPORTATION
6/12/13 → 8/31/15
Project: Research project
-
Potential Utility of Photocatalytic Concrete in Hennepin
Gulliver, J. S. (PI)
5/24/13 → 8/30/13
Project: Research project
-
Determination of Effective Impervious Area in Urban Wate
Gulliver, J. S. (PI) & Wilson, B. N. (CoI)
MN DEPARTMENT OF TRANSPORTATION
6/29/12 → 7/31/15
Project: Research project
-
Baseflow restoration in Minnehaha Creek watershed with s
Nieber, J. L. (PI), Gulliver, J. S. (CoI) & Wilson, B. N. (CoI)
MINNEHAHA CREEK WATERSHED DISTRICT
2/28/12 → 6/15/14
Project: Research project
-
Impacts on Groundwater Quality by Stormwater Infiltratio
Gulliver, J. S. (PI) & Nieber, J. L. (CoI)
2/13/12 → 12/30/13
Project: Research project
-
Turbine Aeration Physical Modeling and Software Design
Gulliver, J. S. (PI)
10/1/11 → 3/30/15
Project: Research project
-
Turbine Aeration Physical Modeling and Software Design
Gulliver, J. S. (PI), Arndt, R. E. (CoI) & Sotiropoulos, F. (CoI)
U.S. DEPARTMENT OF ENERGY (USDOE)
9/30/11 → 3/31/15
Project: Research project
-
Long-term Climate Information and Forecasts Supporting S
Gulliver, J. S. (PI)
Syntectic International LLC, USDOC NAT'L OCEANIC & ATMOSPHERIC ADMIN
9/1/11 → 8/31/13
Project: Research project
-
Development and Evaluation of Effective Turbidity Monito
Wilson, B. N. (PI) & Gulliver, J. S. (CoI)
MN DEPARTMENT OF TRANSPORTATION
6/27/11 → 7/31/14
Project: Research project
-
Design Oversight for an Iron Enhanced Sand Filtration Sy
Gulliver, J. S. (PI)
EMMONS & OLIVIER RESOURCES, INC., BROWN'S CREEK WATERSHED DISTRICT
4/1/11 → 8/30/11
Project: Research project
-
Assessing Enhanced Swales for Pollution Prevention
Gulliver, J. S. (PI)
MN POLLUTION CONTROL AGENCY, U.S. ENVIRONMENTAL PROTECTION AGENCY
1/1/11 → 8/30/15
Project: Research project
-
Assessing Iron Enhanced Filtration Trenches
Gulliver, J. S. (PI)
CITY OF PRIOR LAKE, MN POLLUTION CONTROL AGENCY
1/1/11 → 8/31/15
Project: Research project
-
Removal efficiency and washout testing of Downstream Def
Marr, J. D. (PI) & Gulliver, J. S. (CoI)
10/21/10 → 10/31/11
Project: Research project
-
Infiltration testing of the Woodland Development in Minn
Gulliver, J. S. (PI)
10/1/10 → 1/31/11
Project: Research project
-
Assessing and Improving Pollution Prevention by Swales
Gulliver, J. S. (PI) & Nieber, J. L. (CoI)
MN DEPARTMENT OF TRANSPORTATION
7/30/10 → 8/31/14
Project: Research project
-
Performance Assessment of a Rain Garden for Capturing Su
Gulliver, J. S. (PI)
4/5/10 → 8/31/11
Project: Research project
-
Performance Assessment of an Iron-Enhanced Sand Filtrati
Gulliver, J. S. (PI)
1/1/10 → 11/30/10
Project: Research project
-
Aqueous Pollutant Capture by Enhanced Filter Media
Gulliver, J. S. (PI)
MN POLLUTION CONTROL AGENCY, U.S. ENVIRONMENTAL PROTECTION AGENCY
10/1/09 → 8/29/14
Project: Research project
-
Estimating Size Distribution of Suspended Solids in MN
Mohseni, O. (PI) & Gulliver, J. S. (CoI)
MISSISSIPPI WATERSHED MGMT. ORGANIZATION
10/29/08 → 4/30/11
Project: Research project
-
Phosphorus Release from Sediments in Lake Winona
Gulliver, J. S. (PI) & Weiss, P. (Prior Principal Investigator)
9/9/08 → 7/31/09
Project: Research project
-
Assessment and Recommendations for Operation of Standard
Mohseni, O. (PI) & Gulliver, J. S. (CoI)
MN DEPARTMENT OF TRANSPORTATION
7/8/08 → 5/31/12
Project: Research project
-
Performance of Low Impact Practices on Stormwater Pollut
Gulliver, J. S. (PI), Anderson, J. (CoI), Hozalski, R. M. (CoI) & Nieber, J. L. (CoI)
MN POLLUTION CONTROL AGENCY, U.S. ENVIRONMENTAL PROTECTION AGENCY
2/1/08 → 8/31/12
Project: Research project
-
-
Estimating the Size Distribution of Suspended Sediments
Gulliver, J. S. (PI), Mohseni, O. (CoI) & Ellis, C. (Other Role)
MN DEPARTMENT OF TRANSPORTATION
12/4/07 → 2/28/11
Project: Research project
-
Assessment and Maintenance of Stormwater Best Management
Swackhamer, D. L. (PI) & Gulliver, J. S. (CoI)
8/23/07 → 1/31/10
Project: Research project
-
Quantifying stormwater infiltration rates on developed s
Gulliver, J. S. (PI) & Nieber, J. L. (CoI)
6/28/07 → 6/30/09
Project: Research project
-
Assessment of the Underground Stormwater Management Devi
Mohseni, O. (PI) & Gulliver, J. S. (CoI)
MN DEPARTMENT OF TRANSPORTATION
5/30/07 → 3/31/10
Project: Research project