If you made any changes in Pure, your changes will be visible here soon.

Projects 2007 2020

culvert
sedimentation
fish
laboratory
Wind turbines
aquatic environment
hydraulics
modeling

Thirsty Duck Phase II Rating Curve Development

Taylor, C. & Marr, J. D.

THIRSTY DUCK, LTD.

9/17/1212/31/12

Project: Research project

Rating
Embankments
culvert
connectivity
sediment budget
river discharge
river basin
drainage
basin

Fargo Moorhead - Maple River Model Study

Marr, J. D. & Ellis, C.

HDR ENGINEERING, INC.

9/4/126/30/15

Project: Research project

river
aquatic environment
hydraulics
modeling
Steel pipe
Service life
wind turbines
thresholds
acoustics
Scour
Monitoring
river basin
sediment
Drag
Testing

Bridge scour monitoring technologies: Development of eva

Marr, J. D., Ellis, C., Lueker, M. & Recknor, A.

MN DEPARTMENT OF TRANSPORTATION

9/26/081/31/11

Project: Research project

Sampling
Testing
river basin
sediment
calibration
farms
carbonate
experiment
research support
sturgeon
performance assessment
stormwater
suspended sediment
heavy metal

Flow Visualization around a Gabion Structure

Taylor, C. & Marr, J. D.

HESCO Bastion USA

11/15/1112/31/12

Project: Research project

Flow visualization
tailings
beach
laboratory