If you made any changes in Pure, your changes will be visible here soon.

Projects 2007 2020

Finished
research support
sturgeon
tailings
beach
laboratory
culvert
connectivity
wind turbines
thresholds
acoustics
aquatic environment
hydraulics
modeling
aquatic environment
hydraulics
modeling
Steel pipe
Service life
river basin
sediment
river basin
sediment
Embankments

Thirsty Duck Phase II Rating Curve Development

Taylor, C. & Marr, J. D.

THIRSTY DUCK, LTD.

9/17/1212/31/12

Project: Research project

Rating

Fargo Moorhead - Maple River Model Study

Marr, J. D. & Ellis, C.

HDR ENGINEERING, INC.

9/4/126/30/15

Project: Research project

river
culvert
sedimentation
fish
laboratory
Wind turbines
sediment budget
river discharge
river basin
drainage
basin

Flow Visualization around a Gabion Structure

Taylor, C. & Marr, J. D.

HESCO Bastion USA

11/15/1112/31/12

Project: Research project

Flow visualization
Scour
Monitoring
Sampling
Testing
Drag
Testing
calibration
farms

Bridge scour monitoring technologies: Development of eva

Marr, J. D., Ellis, C., Lueker, M. & Recknor, A.

MN DEPARTMENT OF TRANSPORTATION

9/26/081/31/11

Project: Research project

performance assessment
stormwater
suspended sediment
heavy metal
carbonate
experiment