If you made any changes in Pure, your changes will be visible here soon.

Projects 2007 2020

calibration
farms
Drag
Testing

Bridge scour monitoring technologies: Development of eva

Marr, J. D., Ellis, C., Lueker, M. & Recknor, A.

MN DEPARTMENT OF TRANSPORTATION

9/26/081/31/11

Project: Research project

Sampling
Testing
performance assessment
stormwater
suspended sediment
heavy metal

Flow Visualization around a Gabion Structure

Taylor, C. & Marr, J. D.

HESCO Bastion USA

11/15/1112/31/12

Project: Research project

Flow visualization

Thirsty Duck Phase II Rating Curve Development

Taylor, C. & Marr, J. D.

THIRSTY DUCK, LTD.

9/17/1212/31/12

Project: Research project

Rating
Wind turbines
Scour
Monitoring
culvert
sedimentation
fish
laboratory

Fargo Moorhead - Maple River Model Study

Marr, J. D. & Ellis, C.

HDR ENGINEERING, INC.

9/4/126/30/15

Project: Research project

river
aquatic environment
hydraulics
modeling
Steel pipe
Service life
river basin
sediment
sediment budget
river discharge
river basin
drainage
basin
river basin
sediment
aquatic environment
hydraulics
modeling
Embankments
research support
sturgeon
culvert
connectivity
tailings
beach
laboratory
wind turbines
thresholds
acoustics
carbonate
experiment